Endoscopy Suite Refurbishment

Hammersmith Hospital, Imperial College Healthcare NHS Trust

A full refurbishment of Hammersmith Hospital Endoscopy Suite with minimum impact on the running of the hospital and the patients.

The project entailed the full refurbishment of the ground floor of Block A to form a state-of-the-art Endoscopy Suite, including a fluoroscopy procedure room and two additional procedure rooms with functional facilities including; clean and dirty scope rooms and clean and dirty utility rooms.

Consultation rooms, recovery and pre-admission suites were all refurbished, along with the main reception areas, staff offices and amenity areas. In addition to single patient rooms and new WC and shower facilities throughout.

This challenging project was undertaken in a ‘live’ hospital environment and was heavily bias on M&E services, which were undertaken over several phases to meet the client’s requirements.

KEY POINTS:

  • Refurbishment of Endoscopy Suite
  • Challenging project undertaken in ‘live’ hospital environment
  • Heavily biased M&E services

LOCATION:
London

VALUE:
£1,650,000

PRINCIPAL CONSULTANTS:
Ansell & Bailey, WT Partnership, Wareham Associates, ETA Projects

PROJECT DURATION:
38 weeks

VIEW MORE SPECIALIST HEALTHCARE PROJECTS

Main Theatres Refurbishment Project

Main Theatres Refurbishment Project

Logan Construction were delighted to secure this challenging hospital theatre refurbishment project, working in partnership the Surrey and Sussex Trust.

Lewisham MRI Scanner Works

Lewisham MRI Scanner Works

The MRI refurbishment project started with ten weeks of enabling works, which required us to form new facilities and undertake a phased decant programme to free up the required areas of the building.

New Hybrid Theatre

New Hybrid Theatre

A much needed extension and ground breaking theatre at the Royal Brompton Hospital in London.

New Linac Suite

New Linac Suite

Refurbishment and upgrade of the LINAC2 suite at the Royal Free to provide a new and modern environment which facilitated the installation of a new linear accelerator by the specialist Varian.

Interventional Radiology Unit

Interventional Radiology Unit

Comprising two distinct phases, this project comprised the modernisation of Basildon Hospital’s existing Radiology department