Lewisham and Greenwich NHS Trust

LEWISHAM HOSPITAL – WINTER PRESSURES REFURBISHMENT

  • Two stage works
  • Works within active area of hospital
  • Phased works to keep bed loss to minimum
  • Project completed on time and to budget

Full refurbishment of hospital wards with minimum impact on nursing operations and patients. This contract was secured on a two stage basis to assist with the very tight delivery timescales and involved the complete refurbishment of six wards including new ceilings, walls, floors, M&E and associated systems. By utilising shifts we maximised available working time. For example the 1,000 m2 Stroke ward was completely refurbished in 8.5 weeks with up to 70 operatives on site in any one day.

 

LEWISHAM HOSPITAL – DIGITAL X-RAY UNIT

Refurbishment and remodelling of the digital X-Ray suite on a very restricted site which is surrounded on all sides by existing hospital buildings (including highly sensitive hospital departments) that had to remain fully operational at all times during the works.

 

LEWISHAM HOSPITAL – DELIVERY WARD

  • 9 week refurbishment project
  • Live hospital site
  • Medical gas installations

Refurbishment of delivery and maternity ward carried out whilst maintaining the full functionality and use of the remaining delivery ward. The project required the installation of a new AHU in the plant room and associated ventilation in several areas. New Wandsworth bedhead trunking and associated services, including new medical gas installations, were also delivered. New walk-in showers were installed and works co-ordinated to maintain minimal disruption to the ward area below.

KEY POINTS:

  • Dynamic relationship with the Trust
  • Flexible delivery model that provide minor works packages as well as major projects
  • 34 projects completed to date
  • circa £8m

LOCATION:
Lewisham, London

VALUE:

Winter Pressures Refurbishment
£3,000,000

Digital X-Ray Unit
£780,000

Delivery Ward
£560,000

“I would like to pass on my personal and the Trusts thanks to everyone involved with the Winter Pressures Project for all your hard work, dedication and efforts to meet the deadline. I have received several congratulatory messages, tempered with the words – “how on earth did you manage to finish all this on time?” … Keith, Maple and Sapphire wards are amazing, well done to all.”

Liz Butler
Trust Chair

VIEW MORE HEALTHCARE PROJECTS

Royal Surrey County Hospital NHS Foundation Trust

Royal Surrey County Hospital NHS Foundation Trust

Working with Royal Surrey County Hospital NHS Foundation Trust since 2015.

Frimley Park NHS Foundation Trust

Frimley Park NHS Foundation Trust

Working with Frimley Park NHS Foundation Trust for more than 5 years.

Imperial College Healthcare NHS Trust

Imperial College Healthcare NHS Trust

Our relationship with the Imperial College Healthcare Trust dates back almost a decade.

Royal Free London NHS Foundation Trust

Royal Free London NHS Foundation Trust

Working with Royal Free London NHS Trust since 2013.

Guy’s and Thomas’ NHS Foundation Trust

Guy’s and Thomas’ NHS Foundation Trust

This relationship saw St Thomas’ historic A&E department completely refurbished and is Logan’s biggest contract to date.