Imperial College London

Logan Construction has been a trusted and reliable supplier of ICL since 2015. Over the years, we have had the honour of delivering eight refurbishment projects worth a total of £4m. We are proud of our long-standing relationship with the College and we remain committed to delivering exceptional results on every project we undertake.

Architect: Various
Quantity Surveyor: Various
Location: London
Duration: Various

About This Higher Education Project

Imperial College London (ICL) is a world-class university with a mission to benefit society through excellence in science, engineering, medicine and business.  ICL focuses on science, engineering, business and medicine. The college was previously a member of the University of London and became an independent university in 2007.

Our team of experts has worked tirelessly to ensure that each project is completed to the highest standards of quality, within the specified time frame and budget. We have been able to achieve this by leveraging our extensive experience, technical expertise and a deep understanding of our clients’ needs.

Client feedback

In a nutshell, the end users and I are very happy with this first class facility. The project did prove challenging at times (as most projects at Imperial sometimes do) however a collective team effort by all ensured successful completion to a very high standard. The Logan Construction team delivered fit for purpose, highly serviced Physics research laboratories set over two floors to a very high standard. I would rate as one of the best refurbishments in the Department of Physics in the last decade. The end users and I are extremely satisfied with the end result and we have a Quantum Technologies laboratory facility to be proud of. I was particularly impressed by the high quality finish and fully coordinated mechanical and electrical installations that was so needed for space. The Logan site team including subcontractors and design team worked very closely and collaboratively throughout the project to achieve all deliverables. It was a challenging project especially during term time with the site in close proximity to a live lecture theatre and Laser laboratories. I was impressed by the Logan site team approach to design challenges and incorporating innovative solutions. A productive lessons learned workshop was also undertaken post completion. Finally, I would like to extend a genuine thank you to all of the Logan Quantum Technologies team in particular Colin Hart and Marc Terry who were indispensable and professional throughout the project and an absolute pleasure to work with.
Quote Icon
Doug Hudson, Faculty of Natural Sciences
ICL
Go to Top