Redhill Nursery

Education and Skills Funding Agency

Provision of a new children’s day-care nursery together with site development and external works. The project was within a new build mixed use residential development.

The project comprised a nursery building of approximately 507 m2 gross floor area to accommodate and provide day care facilities for around 100 children.

Site preparation initially required the diversion of a buried main electricity supply cable.

The building was timber framed construction on a concrete slab foundation with a canopy to the front of the building and external roof terrace.

Internally the nursery comprises four activity rooms, a sensory room, kitchen, office, staff room together with toilets, plant room and stores.

Externally the gardens and roof terrace were designed to provide additional safe play areas during summer periods.

The purpose built sensory room includes specialist equipment such as a laser projector, laser sky, bubble tubes, mirror balls and a talking cube.

KEY POINTS:

  • Built within a highly populated residential area
  • State-of-the-art and environmentally friendly timber frame construction
  • Constructed on a former sand quarry
  • Built on time and within budget

LOCATION:
Surrey

VALUE:
£1.1m

PRINCIPAL CONSULTANTS:
PRP Project Services, HOCA, RB Design

PROJECT DURATION:
10 weeks

Our state-of-the-art day nursery is safe and secure, built with children in mind with well-resourced playrooms that offer a wide and existing range of learning experiences.

VIEW MORE EDUCATION PROJECTS

Becket Keys CofE Secondary School

Becket Keys CofE Secondary School

Construction of a new three storey replacement teaching block, named the Welby Building, was developed via closed panel timber frame solution on the south eastern corner of the grounds at Becket Keys.

Brook House Primary School

Brook House Primary School

This single stage Design & Build project comprised the fit out of a new shell and core building over two levels for the purpose of creating a new 420 place, two form entry primary school.

Norton Knatchbull School

Norton Knatchbull School

Logan Construction undertook the refurbishment and upgrading of Norton Knatchbull School to deliver updated and modern buildings for current and future students.

West London Free School

West London Free School

Conversion and refurbishment of an office building into an education facility. The new facilities are located over the four storey building and provide modern space for 240 students.

Westcliff High Grammar School For Boys

Westcliff High Grammar School For Boys

Refurbishment and extension to an existing technology block at Westcliff High School for Boys.