Theatre 13

Royal Surrey County Hospital

Remodelling and refurbishment of existing hospital facilities into a much needed operating theatre.

This project comprised the conversion of ancillary rooms into a new purpose built surgical operating theatre and associated recovery bed area, allowing the trust to add specialisms to their range and ease pressure on existing theatres.

The works included concrete crunching, strip out, structural steel, specialised mechanical and electrical works and operating room laminar flow systems and were undertaken adjacent to existing and fully functional theatres in constant use during the build.

The scheme’s success was due to a positive collaborative approach with an inspirational and driven team, making this project a hugely enjoyable process at all stages in very difficult surroundings. The clinical and design teams worked closely with Logan to provide and deliver a quality operating theatre on time and within budget to a very satisfied client.

KEY POINTS:

  • Remodelling and refurbishment
  • Creation of new operating theatre
  • Works undertaken within a fully functioning hospital
  • Included pioneering da Vinci Si theatre robots

LOCATION:
Guildford, Surrey

VALUE:
£1,200,000

PRINCIPAL CONSULTANTS:
ADP Architects, K2, WT Partnership

PROJECT DURATION:
26 weeks

“This new cutting edge trauma facility will assist with the increased demand for pelvic and urological cancer surgery, as we can now carry this out in two adjacent theatres, fully equipped with robots, which do not have to move.”

John Denning, Trust Chairman
Royal Surrey County Hospital

VIEW MORE SPECIALIST HEALTHCARE PROJECTS

Main Theatres Refurbishment Project

Main Theatres Refurbishment Project

Logan Construction were delighted to secure this challenging hospital theatre refurbishment project, working in partnership the Surrey and Sussex Trust.

Endoscopy Suite Refurbishment

Endoscopy Suite Refurbishment

A full refurbishment of Hammersmith Hospital Endoscopy Suite with minimum impact on the running of the hospital and the patients’.

Lewisham MRI Scanner Works

Lewisham MRI Scanner Works

The MRI refurbishment project started with ten weeks of enabling works, which required us to form new facilities and undertake a phased decant programme to free up the required areas of the building.

New Hybrid Theatre

New Hybrid Theatre

A much needed extension and ground breaking theatre at the Royal Brompton Hospital in London.

New Linac Suite

New Linac Suite

Refurbishment and upgrade of the LINAC2 suite at the Royal Free to provide a new and modern environment which facilitated the installation of a new linear accelerator by the specialist Varian.